National Industrial Biotechnology Facility

03 Feb 2012

CPI’s team was contracted to deliver feasibility studies and process modelling for both National Industrial Biotechnology facilities at Wilton. In each case, the team went on to devise concept and then detailed designs for the pilot and demonstrator facilities, and delivered the projects on time and to budget.

Share This Page

Working to a very broad brief, CPI’s Sustainable Engineering team was contracted to deliver feasibility studies and process modelling for both National Industrial Biotechnology facilities at Wilton. In each case, the team went on to devise concept and then detailed designs for the pilot and demonstrator facilities.

Specifically, the team’s work included scoping the project and devising an optimum process flow. This then allowed them to go on to specify a detailed equipment specification and advise on the layout of plant and equipment within the chosen premises. Their work extended to advising the contractor on procurement and even entering into supplier discussions.

The over-riding objective of the project was that the configuration of equipment needed to be as adaptable as possible, to accommodate any number and application of client projects.

Deadlines were tight, so the team took a realistic approach and worked on design detail while the build was already in progress.

The team’s store of experience gained in industry allowed them to devise a configuration of equipment that would allow processes to operate smoothly and at maximum efficiency.

Also, very little time was available between the approval of the project and the deadline for completion. The team’s high skill levels enabled them to achieve this deadline – with the initial stages up to the specification for contractors being delivered in just one month.